We have decided on stained concrete for the main level flooring. We went back and forth between it and tile, but the concrete won out. Since the existing floor is a hot mess, a thin layer of new concrete will have to be poured over the entire thing. The guys are starting on the kitchen area today.
Here’s a shot of the new dry wall in the pantry. See how the floor is green? That’s the adhesive they put down last night to help the new concrete stick. That’s not toilet paper hanging on the wall, it’s dry wall tape.
Here’s a pic of the kitchen with the dry wall up. Can you start to envision it?
Here’s a few shots of the master bedroom. It’s painted and the crown molding is up. The next step in here will be sanding and staining the floors. After that, the base board can go down.
Lastly, here’s where we have left off in the bathroom. The crown is up, the base is down, and the light fixtures are installed. The toilet is set and the vanity has been built.
Donnie has to do some adjusting to the pipe so that it fits above the shelf. Once that’s done, the faucets should go on and all we need is a mirror. Almost one room done!