Donnie has been spending a lot of time at the house working on the electrical. The entire main level of the house is getting recessed lighting. We decided to go with LED lights. They are supposed to last 25 years and cost less to use.
Here is a picture of the hallway leading to the girls’ rooms and laundry room.
There have been many decisions to make in regards to lighting. Donnie wanted me to pick the color of the switches, the shape of the switches, and which switches control which lights. Honestly, I don’t have a really strong opinion about any of it. I will let him make the call on this and I will surely make the call on many other things down the road.
In addition to laying out the lighting, they also closed in the back wall of the kitchen.
This is what the wall looked like before:
This is what it looks like now:
That is the wall that the range and upper cabinets will be on.
This is what it looks like from the outside.
That plywood is temporary. Ultimately we plan on putting siding around the whole house. That will be down the road a bit.
That’s it for now.
YEAH!! Congrats on the progress! Cant WAIT to see it in Dec!!!
ReplyDeleteGood job Donnie!
ReplyDelete